2010’s

2010’s
In 2010 new cast iron guttering was erected on the north side of the church.
In 2011 the church was left a bequest by Flora Phillips, a regular church attendee which helped towards various repairs.  This year also saw the installation of four electric heaters and new low level flood lights in the ceiling.
In 2012 Mr Endacott, a stained glass expert, carefully removed the first window panes.  These were taken away so that he could renew the lead and clean the glass.  The window was boarded up with plywood while the work was done.  Work carried on over several years.
In 2013 another Quinquennial Inspection Report highlighted that there was still a considerable amount of work that urgently needed doing.  It was also this year that saw a large bequest from Claudia Critchley (her husband had once been a churchwarden of the church).
The roof was the most urgent work that needed to be done but while talks continued regarding the slate, other work was started in the church.
In 2014 the carpenter (Neil) started replacing rotten floor beams and floorboards.  The worst area was in the North aisle where the boards dipped quite alarmingly when you walked on them. The outer entrance door to the porch was repaired, given a new coat of paint and new mesh. It was also this year that saw the final window being restored.
062
The chimney on the North aisle which had a very dangerous lean was careful taken down to roof height and rebuilt straight in the same year.  It was also in this year that a new notice board was bought and erected by the Lych Gate.
It was not until 2015 that the roofers arrived.  It had been agreed that the new Delabole slate was too heavy for the roof beams, so another sort had to be used.  The main aisles were striped first and any of the old slate that was re-useable was kept to one side.  These were eventually used on the South side of the main aisle, South Transept and porch, while the rest of the roof was covered in the new slate.  Most of the fleur de lis ridge tiles broke or disintegrated while being removed, with only a few being suitable to be re-used on the porch.  Recycled ones like those that had been on the North aisle were sourced for the rest of the roof.  Work on the roof eventually finished in 2016.
020
It was also 2015 when new pew cushions were purchased and much appreciated they were by the congregation.  Two new gates were erected in the newly reopened entrance in the lower churchyard.
In 2016 the builders (Michael and Danny) started re-pointing the wall of the North aisle.  They continued around the whole church eventually finishing in 2017.
The carpenter (Neil) also returned and other areas of dodgy floor were replaced (I’m not sure how the floor in the vestry stayed there as it was only dust holding the beams together).  He also repaired some of the pews.
A new alarm system was installed.
DSC_6099
In early 2017 scaffolding was erected inside, so that work could start on the repairs to the ceilings.  A lot of the plaster had come down or cracked when the roof was done, this was repaired and then painted white.  While the scaffolding was up they also coated the woodwork in the ceiling with a special preservative.
New gravel was laid on the path from the Lych Gate to the porch.
In June 2017 a new carpet was laid in the main aisle and vestry.  Before the carpet could go down in the main aisle, four new metal plates were put in the floor over the old stove to replace the old grids.  The kneelers by the altar were also recovered.
Due to a wedding in July 2017 the scaffold came down and work had to stop.  They still have the South transept ceiling to do and it is hoped they will return soon.

 

2000’s

2000’s

In 2004 two new Lych Gate gates were made, work done on the coffin rest and new wood seats made.
Scan_20170818
In 2008 the Quinquennial Inspection Report highlighted that a considerable amount of work needed to be done.  The most urgent being the repair of the windows and the roof.  A concerted effort to raise money for the repair of the windows began.  Several events were held including concerts by Orlando Joplin.
In 2009 a new North door was made and fitted.

1990’s

1990’s
In 1991 the lead covering and timber structure of the roof on the tower were renewed. A new access ladder was also made for the tower.  The West window of the tower was re-glazed and the whole tower re-pointed.  It was also at this time that the old oak frame for the bell was renewed, the bell was taken away for a new clapper and then re-hung on new fixings. Various plaster work was carried out inside the church and a new wall safe was installed.
Scan_20170817 (2)
In 1992 a new cast iron downpipe was put on the tower.
In 1993 the slate sun dial, previously on the south wall of the tower was re-fixed to the south wall of the transept and a new gnomon fitted.  The floor in the bottom of the tower was raised to the same level as the vestry, new cupboards were also fitted in the old door entrance and a sink unit was installed.  Wooden screens to the storage and robbing area were installed.  Some re-pointing was also done to the South and North wall.
It was also this year that churchwardens staves were donated to the church.
In 1994 the church was completely rewired and new lighting installed.
In 1995 the Lych Gate gates were repaired and re-hung and the coffin rest was repaired.  The Lych Gate had all the ivy removed. Some panes in the windows were repaired and a new carpet was laid.
In 1997 the interior of the church was redecorated and an oak board listing the rectors was erected.  Minor repairs were also carried out on the porch roof.

1980’s

1980’s
In 1984 the vestry and other broken windows in the church were repaired.
In 1988 a lectern bible and prayer book were sent off to the conservator at the library at Westminster Abbey, where the severe damage made by sellotape was carefully removed.  Other damage was repaired and then rebound.

Scan_20170817 (4)

In 1988 all the kneelers were recovered

1930’s – 1950’s

1930’s
In 1939 the oak screen was installed to make the vestry, the open back benches were replaced with pews, repairs were done to the roof, the Trewirgie aisle (South transept) was renovated and the roof shields were installed.

1950’s
Sometime between 1951 and 1952 electricity was installed in the church.
In 1955 the roof and vestry floor were repaired.
In 1956 it was agreed to sell the rectory.
It is believed that in this decade the second bell was removed.

1300’s – 1800’s

1300’s
The North aisle was built onto the chapel.

1600’s
In 1658 after a bad storm the tower collapsed on the chapel.  The chapel was restored between 1658 and 1664.
In 1669 the porch was repaired.
In 1675 the tower was repaired.

1700’s
Between 1745 and 1777 when the Reverend Henchman was vicar the skylight and a small square window by the pulpit were installed.
In 1788 Reverend Whitaker had two of the three bells cast into one which bears his name.
In 1790 three windows were altered, two in the aisle and one in the chapel improving the light in the church.  Around this time the roof open to the rafters was enclosed, the Rood screen beam removed and the flight of stone steps, believed to go to the Rood loft, were blocked up.
In this century the raised platform in the chancel was removed, only leaving a small area by the altar and it is probable that the Rood screen was removed then as well.

1800’s
In 1866 the roof was replaced and stone arches straightened.  Some of the roof beams were reused in the altar, font and pulpit.
In 1893 a new area was acquired just below the church for burials.